Prep Work (before installation)
Prep Work (before installation)
A drain for the anchor locker needed to be added. (More fun drilling into the boat).
Now for a test fitting to see if everything is going to fit in the boat as planned . . .
The wiring needed to be routed slightly differently and I added some conduits to protect them.
Exposed edges needed to be sealed with gelcoat, along with some other prep work.